<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=192888919167017&amp;ev=PageView&amp;noscript=1">
Monday,  November 18 , 2024

Linkedin Pinterest
News / Clark County News

Overnight closure in Portland of I-84 planned for Jan. 12

The Columbian
Published: January 6, 2018, 5:57am

On Friday night, Jan. 12, Interstate 84 will close in both directions between interstates 5 and 205.

The closure begins at 11 p.m. All lanes are scheduled to reopen by 6 a.m. Saturday, Jan. 13. Single-lane closures and some ramp closures on I-84 will begin as early at 8 p.m.

Plan for alternative routes.

The full I-84 closures will include all on- and offramps to and from I-84 between I-5 and I-205, including:

• OMSI/Central Eastside Industrial District offramp from I-5 northbound.

• All ramps from I-5 and I-205 to I-84.

• Ramp to I-84 eastbound from the Morrison Bridge.

The road will be closed so crews can install new electronic sign structures at two different locations on the interstate. The work is weather-dependent and may be rescheduled if there is strong wind.

Loading...